Monday, May 28, 2007

Site1



Here is the first site which i was showed by the construction manager. we are up on the warehouse roof and here we can see a box gutter and a parapet wall. the gutter has a straight run, is larger than the minimum 300mm width and 100mm depth, and is string enough to carry the load of us. he showed me the method of roofing connection also which was lysaght klip-lok, which klips the roof straight on to the purlin through a special connection. you are also able to see the connection between the concrete panels which were cast off site.

1 comment:

ryan said...

Hey nice pictures i didnt see you at that construction site by anychance did i?