Wednesday, May 30, 2007

Article: When Does Concrete Make More Sense?


This article basically went over the conditions and scenarios when concrete construction is better to use than steel.
It states that as projects become larger than 50,000 square feet the price of concrete starts to offset tilt-up construction's fixed costs and the method of concrete construction becomes cost-competitive with a metal building. The larger the building, the more advantageous tilt-up construction becomes.
It also states that the location of a site will influence the building materials used. Depending on the rules and regulations of each area some materials may not be used. It gives an example of an area with fairly high restrictions because of closeness of the neighbouring buildings. Fire restrictions are therfore in place and steel would become an unsutable alternative.
The moble crane lifts the panel and tilts it into position over the footing on this tilt-up construction project in the Dallas / Ft. Worth, TX area. In many cases, tilt-up construction is a better - and even more economical - choice than steel buildings

Article 2: Tilt-up Construction: A General Contractor's Approach to Innovative Commercial Building Construction

www.generalcontracter.com


This article basically explains why tilt-up construction is an innovative method for building commercial facilities with amazing speed, safety, and cost benefits. It also explains the differences between tilt up and other forms of construction.

Tiltwall building's walls are created horizontally in large slabs of concrete called panels. The panels are then lifted, or tilted up, into position around the building's slab. This means the tilt-up structure's exterior wall is virtually finished when it is tilted into place.

"Tilt-up construction (also called tiltwall or tilt wall construction) has a long history, but its widespread use is a relatively new phenomenon. In spite of this, tiltwall construction is fast becoming the method of choice for constructing modern warehouses, call centers, distribution centers, retail stores, office and storage buildings and other types of industrial and commercial facilities."

Tuesday, May 29, 2007


This is the model put together. You can see the beam connection to the cleat and purlin. The roofing structure is also seen with the mesh, insulation and metal roof seen.

This is another pic of my model. This time you can see the metal roofing. The roofing is screwed on to the purlin, holding on the insulation and mesh.

Model


Here is a picture of my model. You can see the i beam, the cleat which is welded to the beam, the zed purlin which is bolted to the cleat, and the mesh and insulation which is held down by the roofing.

Research


The following pictures are research for the assignment. They include 3 or 4 covers of info brochures

site 6


This shows the roof structure. This is a truss system with metal roofing.

Site 6


This is a warehouse but with a timber frame. This is not as big as the previous sites, but you can still see the cleats and the purlins attached to the rafters.

site5


This is a picture of a pad footing connection to the column. A lthough the connection cant be seen, a pin base joint would be used. The slab would have been poured over the pad footing.

Site 5


Here is another pic of the knee joint connection. However in this picture you can see the downpipe which falls down from a box gutter. The box gutter must be a min width of 300mm and a min depth of 100mm.

site5


At Mitre 10 again. This is a view of the apex connection between the two rafters. This connection is bolted and sometimes welded. The zed purlins are also seen.These hold up the roofing with the sarking, mesh and insulation held together by the metal roofing, which is screwed down into the purlin.

Site Visit 5


Here is a picture of a finished portal frame. This is located at Faggs Mitre 10. You can see the column which is bolted to the rafter creating a knee joint. This knee joint transfers bending moments from the roof down into the footings. You can also see the haunching which acts as support for the rafter.

Monday, May 28, 2007

site1


This shows the view from the roof. You can see th marks where the crane would hav lifted the panels in place.

site1


This shows the connection of the pre-cast panels. You can see on the right a connection has already been made and filled, but the temporeary join is yet to be removed.

site 1


this pic shows the pre cast concrete panels being supported up. they are first craned and placed then hooked on to the supportat the panel and at the slab. when the appropriate connection between the panels and the roof and panel to panel are made the supports will be removed and the conncetion of the supports covered with concrete.

site 1


At the end of my site tour the construction manager let me look through all the various drawings of the project. These were really good to show connection details and just to see what these drawings look like and mean. here is a pic of the panel to wall connection. This shows a section and a mirrored plan and the way in which the panel is tied to the wall and all the required dimentioning.

site1


On the roof of site 1 again. Here the roofing is in different stages of construction. U can see the mesh i still being layed and the excess which still needs to be cut out.