This is a picture of another column connection to the pad footing, at a site on hope street. However this time instead of the 2 bolt pin joint base, there is a Rigid base. The difference here is that there are atleast 4 bolts holding the column and the pad footing, and these bolts are placed at a maximum distance from the centre.
Monday, May 28, 2007
site 3
This is a picture of another column connection to the pad footing, at a site on hope street. However this time instead of the 2 bolt pin joint base, there is a Rigid base. The difference here is that there are atleast 4 bolts holding the column and the pad footing, and these bolts are placed at a maximum distance from the centre.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment